
Please be advised!
The Highway Dept. will be performing road resurfacing work on or about July 22nd and 23rd. A chip stone type asphalt seal and wear coating will be applied to both Abbot Hill and Potter Roads and installed by All States Construction.
Please be advised that this type of application involves small loose stone being applied to the road surface which will remain present for a period of up to 2-3 weeks to allow for curing. We ask that the public please exercise caution for the duration of this period.